Preparation Works For Bathroom - Breaking Ceiling, Demolish A Wall, Pouring Foundation

Ok, it took a long, but here I'm returning to the building bathroom from scratch works

Here is what we are going to do today:

At first we will need to break ceilings or floor at the loft, then we will remove existing inner wall and then we will pour in foundation.

Following works were actually carried out during two days, but for the ease of this article works from both days are featured here in one article.

Loft

Loft

Here you can see loft for our house, flooring (if we can call it so) is completely damaged. A year ago, while replacing roof we removed a few tons of sand from here, see: Unloading Few Tones of Sand from Loft

As you can see from image above, outer walls for upcoming bathroom have been already replaced, now it's time to construct inner walls, for doing that we are going to remove a part of ceiling to have a free acess to remove wall which is downstairs.

Wall to be demolished

Wall to be demolished

A lot of hand power and in about and hour it looks like this:

Wall removed

Wall removed

Nicely! Now, we are going to rebuild this wall from aac blocks, but prior to that I'm going to pour in foundation (as there are no foundation at all for this house. A couple of days later my dad, who is an electrician will help us to fix electricity related questions, as I have an idea to install electrical cabinet on the wall to be constructed

Breaking ceiling

Breaking ceiling

A lot of bizarre shapes, I agree.

Digging a trench for foundation

Digging a trench for foundation

I feel very skilled in foundation works after this Summer's home remodeling experience. 

Foundation for inner wall

Foundation for inner wall

Now in the next days I will construct an aac block wall here and hopefully in the Spring 2017 we will finish basic bathroom works with canalization, water, shower and more.

Add new comment