Preparation Works For Bathroom - Breaking Ceiling, Demolish A Wall, Pouring Foundation
Ok, it took a long, but here I'm returning to the building bathroom from scratch worksHere is what we are going to do today:At first we will need to break ceilings or floor at the loft, then we will remove existing inner wall and then we will pour in foundation.Following works were actually carried out during two days, but for the ease of this article works from both days are featured here in one article.LoftHere you can see loft for our house,…